City and County of Broomfield ยท Front Range service area

Basement finishing in Broomfield, planned around the city and county's 2024 code

Basement finishing in Broomfield runs through a single government that is both city and county, a status Broomfield has held since November 15, 2001. Its Building Division has applied the 2024 International Residential Code to basement finishes since April 15, 2026, and every review starts with a short questionnaire. We plan lower levels across Broomfield, from 1950s Broomfield Heights to the Anthem neighborhoods, and this page follows that questionnaire line by line.

Open space and a pond in Broomfield with the Front Range in the distance
Photo: Andreas Miller on Unsplash

Broomfield's basement questionnaire, answered before design

A Broomfield basement submittal includes the Basement Finish and Home Remodel Questionnaire, plans, the General Permit Application and, when the owner will do any part of the work, a Homeowner Statement. Interior structural changes add an engineer-stamped report. The questionnaire reads like a site survey checklist, and we treat it as one.

Is an accessory dwelling unit proposed?

The form's first question is whether the basement will become an ADU, and if so, whether it gets a separate entrance. A guest room for visiting family and a second dwelling are different things at review, so this gets settled before anything is drawn.

What kind of floor is it?

The form separates slab-on-grade floors from structural wood and structural concrete floors. That answer decides whether the walls need to float. Wood that touches the slab or foundation must be naturally durable or preservative-treated.

Are walls or windows changing?

Removing or altering a wall requires an engineer letter or proof that no part of it is load-bearing. Adding or enlarging a window or door in an exterior wall also requires an engineer letter, and a new foundation opening may call for special inspection by a third party or the design engineer. The rest of the form asks about moving underground plumbing, adding a subpanel, insulation values, new gas appliances, which need spec sheets, and how any shower pan will be built.

A warm, low-lit living room with a long sofa, leather ottomans and a band of clerestory windows
Photo: Spacejoy on Unsplash

Inspections in Broomfield are grouped, and the plans stay on site

Broomfield runs rough electrical, framing, plumbing and mechanical as one combination inspection, called when all rough-in work is finished and the space is ready for drywall except insulation. Insulation is inspected separately, followed by tile backer and the drywall that protects storage under the stair. A suspended grid ceiling adds an above-ceiling inspection before the tiles go in. The final is again a single combined visit, and no furniture moves in until it passes.

Keep the approved plan set, stamped as reviewed for code compliance, at the house for every visit. If it is missing, no inspection happens. Our construction sequence is built around those hold points.

Soils reports, radon and the occasional septic system

Broomfield states the floating-wall rule plainly: because basement floors can heave, non-bearing walls on slab floors are built to accommodate movement as the site-specific soils report directs, and the handout notes that the void may be 2 to 3 inches or more. The original soils report for the lot is worth finding before design for exactly that reason.

Radon comes next. Broomfield's public health department reported that almost 47 percent of radon tests in Broomfield from 2005 through 2021 came back high, and residents can order a free kit while supplies last. A fan and vent pipe are far easier to plan than to retrofit behind new drywall, as our notes on radon and expansive soils explain.

One line in the handout is unusual for the metro area. Adding sleeping rooms may require a larger septic system, and Broomfield's Health and Human Services staff take that question. If your house is on septic, a basement bedroom starts with that call.

From Broomfield Heights to Anthem Highlands

Broomfield Heights began in 1955 as a master-planned community billed as a model city, laid out beside the new Denver-Boulder Turnpike. Broomfield incorporated in 1961 with about 6,000 residents and counted 74,112 at the 2020 census. Annexations between 1969 and 1972 pushed the city into Jefferson, Adams and Weld counties on top of Boulder County, and that four-county split led voters to approve the 1998 constitutional amendment that created the City and County of Broomfield.

The housing range follows that timeline, from the original Broomfield Heights streets through Northmoor Estates, Brandywine and McKay Landing to newer northern areas such as Anthem Highlands, Wildgrass and Vista Highlands.

A blue armchair and a floor lamp beside a tall window in a dark blue room
Photo: Clay Banks on Unsplash

Room choices for a Broomfield lower level

The ADU question shapes the program. A bedroom-and-bath guest suite stays part of the main house; add a full kitchen and a separate entrance and the review changes character. A wet bar for entertaining gives a lower level hosting capacity without crossing that line. For a media room, the 2024 code's 7-foot minimum in habitable space, with beams and ducts permitted to project to 6 feet 4 inches, sets how much sound-control layering the ceiling can take.

Neighboring Westminster still reviews under the 2021 code, and Boulder to the northwest runs its own separate process, so a design drawn for a house across the line needs its own code check.

Getting a Broomfield basement started

If you can already answer the questionnaire's questions, you are most of the way to a scope. If not, the first visit sorts them out. Start planning with a few photos and the year your house was built.

Basement finishing questions from Broomfield homeowners

What documents does Broomfield require for a basement finish permit?

Broomfield asks for the Basement Finish and Home Remodel Questionnaire, plans, the General Permit Application and a Homeowner Statement if the owner will do any of the work. Interior structural changes also need an engineer-stamped report, and new or enlarged exterior openings need an engineer letter.

How big is the floating wall gap in a Broomfield basement?

Broomfield ties it to the site-specific soils report for the lot. Its handout notes the void may be 2 to 3 inches or greater, so the soils report sets the number on the drawings.

Can a Broomfield basement be permitted as an accessory dwelling unit?

The questionnaire asks up front whether an ADU is proposed and whether it will have a separate entrance, so the city reviews that path deliberately. Whether an ADU works for your property depends on Broomfield's rules for the lot, which is why we confirm it with the Building Division before design.

Is radon common in Broomfield homes?

Broomfield's public health department reported that almost 47 percent of radon tests in Broomfield between 2005 and 2021 came back high. Free kits are offered to residents while supplies last, and testing before framing lets any mitigation pipe be planned into closets or soffits.

Which building code does Broomfield use for basement finishes?

Broomfield's 2024 code update took effect April 15, 2026, bringing in the 2024 ICC codes and the Colorado Low Energy and Carbon Code. The current basement handout is based on the 2024 International Residential Code and the 2023 National Electrical Code.

More answers on permits, egress, radon and flooring are on our basement finishing questions page.

Start your Broomfield basement plan

Five short questions about the space you have and the one you want. Your answers shape the first conversation, so it starts from your house.

Discuss your project
Dream Basement Finishing
Discuss your project

Working in Denver and the Front Range, from Colorado Springs to Fort Collins.